NEW RECORD- "Młodzież Punkowa 33 1/3" |
   Polski English Start Gallery MP3 Store Weblinks Contact
Friday, 07 August 2026   
Navigation
Start
History
The band
Discography
Lirics
Concerts
Gallery
MP3
Store
Forum
Weblinks
Contact

News archive
Random Photo
24
24
Woodstock 2004
Users Online
Guests Online: 4
No Members Online

Registered Members: 1049
Newest Member: elizabara51
Top 5 links
INRI 65535
LENIWIEC 65535
KONFLIKT 65535
N.V.U 65535
Mini statistics
Members : 1049
Download mp3 : 5707
View photo : 22369
View Links : 262140
 View Thread
Author Irrigation grooving sewing machine Construction process
fengqingxue
Member

Posts: 4185
Location: newyork
Joined: 18.01.16
Posted on 09-09-16 00:25
<h3>1. Preparatory work</h3>
<p>Make sure the slotting machine and crack sealing machine are working well.Confirm the joints design according to the situation of pavement cracks. Start the crack sealing machine and put the sealant into the pot to be heated and mixed to 193℃ but not exceed 204℃.Trailed the crack sealing machine back of the truck, equips the sealant, separated verge, safety signs and slotting router and piggy blower or heating lance on the truck.Hang to predetermined construction sites, closed the half of road demi to be as a construction zone.</p>
<h3>2. Slotting </h3>
<p>Adjusted the slot depth according to the design of slotted size in advance, then start to slot. Adjust the slot size according to the type of crack width to meet the minimum requirements.</p>
<h3>3. Crack cleaning</h3>
<p>Clear up the dust inside the cracks and both sides of the slag at least 10cm scope thoroughly,be clean, dry and suitable temperature for operation plane.</p>
<h3>4. Sealing </h3>
<p>(Caution:If the temperature of fill joint is below 5 ℃ , sealing machine must be equipped with a heat gun for the slotted cracks , if not heat the pothole at this temperature will reduce the adhesion of the sealant; if the temperature is high than 5 ℃,it may not necessary to be heated, usually the effect will be better if heated. ) Pouring the sealant to the slot averagely after the sealant temperature reached , there is a blade head equipped on the sealing machine gun, which can blow away the excess material, so that the sides of the fracture line can be same width and the thickness of the seal tape.</p>
<h3>5. Maintenance </h3>
<p>After pouring sealant, the traffic can be open after the sealant become cool enough and dust cleared up. The general cooling time is around 15 minutes, the exact traffic opening time can be flexible according to the temperature conditions.</p>

<p>Related Sites:<br />
high quality asphalt road repairing crack sealing machine<br />
Practical Asphalt Road Maintenance Of Major Equipment<br />
German Car Maker Highway Snow Removal<br />
Paul Asphalt Material Applications
</p>
Guest
Username

Password

Remember Me



Register
Lost Password?
NEW RECORD

CD, CASSETE, T-SHIRT
etc.
www.pasazer.pl

Strona wykorzystuje: PHP-Fusion v5.00 2003-2004
prowadzenie strony Bunt: piotrgiglewicz@wp.pl
5144664 Unique Visits  
Zapraszamy do Punkowego Serwisu Muzycznego !!!