NEW RECORD- "Młodzież Punkowa 33 1/3" |
   Polski English Start Gallery MP3 Store Weblinks Contact
Saturday, 08 August 2026   
Navigation
Start
History
The band
Discography
Lirics
Concerts
Gallery
MP3
Store
Forum
Weblinks
Contact

News archive
Random Photo
4
4
Rzeszów 2003
Users Online
Guests Online: 3
No Members Online

Registered Members: 1049
Newest Member: elizabara51
Top 5 links
INRI 65535
LENIWIEC 65535
KONFLIKT 65535
N.V.U 65535
Mini statistics
Members : 1049
Download mp3 : 5708
View photo : 22369
View Links : 262140
 View Thread
Author Laying method to warm the floor
fengqingxue
Member

Posts: 4185
Location: newyork
Joined: 18.01.16
Posted on 17-08-16 10:57
Heating system environment is more complex, higher thermal conductivity of the floor, dimensional stability requirements. In order to ensure better heat conduction and prevent deformation of the floor, you should choose a thickness no greater than 8mm laminate flooring. While the average thickness exceeding 8mm solid wood flooring, bamboo flooring, solid wood flooring and laminate flooring it should not be used to warm the system of the occasion.
Before laying claim: pre-construction must heating system for heating water to detect water temperature of at least 50 ℃, heating system is operating normally, and incubated for 12 hours or more. Confirm no leakage before construction. Not the above tests will not be construction; construction method does not allow the destruction of the earth's surface, so as not to damage the cooling coil; the cold in winter construction, flooring should be stored in advance in the field more than 12 hours in order to adapt to changes in temperature, reducing the deformation of the floor; installation should be checked before the ground is flat, dry, clean windows and doors are complete, related facilities for leaks, check the door and the ground clearance is enough; the special mat neatly laid on the ground, at the interface with the adhesive tape sealing; floor laying direction, the long side of the floor should be consistent with the direction of light rooms, the installation of the first row of the long side of the groove to the floor between the walls, the floor and the wall into the wedge, ensure the floor stretching gap 8-12mm, rows and rows of staggered joint between the floor should be installed, and the wrong seam distance should be greater than 20 cm.
Laying should always observe the difference between the height of the plate surface, cracks and other defects, after passing the order and immediately remove glue splice plate surface residual glue; within 12 hours after installation can not walk on the floor, other follow-up operations should be after 24 hours conduct; flooring longer than 8m, or room, at the interface between the coupling hall, hall, floor to be cut off, leaving 8-12mm expansion joint and connected by bars shut to reduce the occurrence of bagging floor.
Related links:
wood garden decoration

outdoor patio flooring

outdoor flooring



just do it!
Guest
Username

Password

Remember Me



Register
Lost Password?
NEW RECORD

CD, CASSETE, T-SHIRT
etc.
www.pasazer.pl

Strona wykorzystuje: PHP-Fusion v5.00 2003-2004
prowadzenie strony Bunt: piotrgiglewicz@wp.pl
5146656 Unique Visits  
Zapraszamy do Punkowego Serwisu Muzycznego !!!